Phone: 801-270-5757
LOCAL 57
1 Results

  Status Book Contractor Start Date/Time # Positions Location Duration
1. 1. Open Book : Contractor: Sturgeon Electric Start Date/Time: 05/01/2025 7:00 am # Positions: 6 Location: Delta, UT @ IPP Power Plant Duration: 2 Months
 
Sub Tech (Journeyman Wireman) - Building electrical heavy emphasis on control cable terminations. Per diem $125
  Hours Per Week: 60
 

-
Contact Info
International Brotherhood of Electrical Workers Local Union 57
3400 W 2100 S, Suite B
Salt Lake City, UT 84119
  801-270-5757

Top of Page image
Powered By UnionActive - Copyright © 2025. All Rights Reserved.